E. Ponce finally came back to work on the bathroom after three months of leaving us with ungrouted tiles, no sink and cement on the floor. Since July we have had another HUGE, dripping hole in ceiling over the bathtub. He installed the sink, patched the hole but left us with two big spots of black mold and no hot water. I don't know if this was an improvement or not. I haven't had a shower in three days.
The electricity is back on.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment